---
title: The Latest News in EV Charging Station Infrastructure
description: Complicated building codes. Estimates are as high as $5,000 in prewiring costs to make a garage stall ready for electric vehicle charging, officials say.
image: https://blog.ph1c.com/hubfs/EV%20Garage%20Charging.jpeg
---

[![Phase 1](https://blog.ph1c.com/hs-fs/hubfs/Phase1_Logo.png?width=1470&height=1067&name=Phase1_Logo.png "Phase 1")](https://blog.ph1c.com/)

Open main menu Close main menu

- [Home](https://ph1c.com/home)
- [About](https://ph1c.com/about-us)
- [Contact](https://ph1c.com/contact-us)
- [News](https://blog.ph1c.com/the-latest-in-building-code-and-permitting-news)

[EV](https://blog.ph1c.com/the-latest-in-building-code-and-permitting-news/tag/ev) [Electric Vehicle](https://blog.ph1c.com/the-latest-in-building-code-and-permitting-news/tag/electric-vehicle) [Charging Station](https://blog.ph1c.com/the-latest-in-building-code-and-permitting-news/tag/charging-station) [Building Codes](https://blog.ph1c.com/the-latest-in-building-code-and-permitting-news/tag/building-codes) [EV Charging Stations](https://blog.ph1c.com/the-latest-in-building-code-and-permitting-news/tag/ev-charging-stations)

# The Latest News in EV Charging Station Infrastructure

![Joe Reardon](https://blog.ph1c.com/hs-fs/hubfs/Cool-avatars-anonymous-avatar.jpeg?width=45&name=Cool-avatars-anonymous-avatar.jpeg) 

[Joe Reardon](https://blog.ph1c.com/the-latest-in-building-code-and-permitting-news/author/joe-reardon)

[Share this blog post on Twitter](https://twitter.com/intent/tweet?text=I+found+this+interesting+blog+post&url=https://blog.ph1c.com/the-latest-in-building-code-and-permitting-news/the-latest-news-in-ev-charging-station-infrastructure) [Share this blog post on Facebook](http://www.facebook.com/share.php?u=https://blog.ph1c.com/the-latest-in-building-code-and-permitting-news/the-latest-news-in-ev-charging-station-infrastructure) [Share this blog post on LinkedIn](http://www.linkedin.com/shareArticle?mini=true&url=https://blog.ph1c.com/the-latest-in-building-code-and-permitting-news/the-latest-news-in-ev-charging-station-infrastructure)

![EV Charging in a Garage](https://blog.ph1c.com/hubfs/EV%20Garage%20Charging.jpeg)

**Estimates are as high as $5,000 in prewiring costs to make a garage stall ready for electric vehicle charging, officials say.**

 

Minneapolis is one of the latest jurisdictions to offer incentives for EV chargers in garages. "Trying to tackle one of the biggest challenges in the shift to electric vehicles — the lack of at-home charging at apartments and condos — Minneapolis last year required electric vehicles chargers to be installed in the parking garages of most new construction.  [The effort hit an unexpected roadblock](https://www.startribune.com/minneapolis-offers-incentives-for-ev-chargers-in-new-garages-after-state-code-blocks-requirement/600229871/). A Minnesota building code official told the city that a provision in state law prohibits cities from adopting an ordinance to require building components or systems that differ from those in state building code."

 

New local laws that conflict with existing state laws in not all that uncommon which can bring confusion and frustration to communities. Minneapolis is working around this challenge by offering incentives to move EV charging infrastructure forward. 

"The Minnesota State Building Code was created by the Legislature 50 years ago to establish one set of consistent standards of construction. Although the code is updated every few years, it so far does not address EV charging in buildings."

Some terminology to consider when thinking about EV building codes:

- **EV-installed:** A dedicated "EV-only" parking space that includes full installation of EV charging station(s)
- **EV-capable:** A parking space with the electrical capacity to support future EV infrastructure
- **EV-ready:** A designated parking space with a branch circuit dedicated for EV charging with sufficient capacity for each charging spot

To learn more about building codes and EV charging, Phase 1 is here to help. 

 

 

### Leave a Comment

## Related Articles

[![EV Charging is here.](https://blog.ph1c.com/hubfs/PorscheEV.jpeg)](https://blog.ph1c.com/the-latest-in-building-code-and-permitting-news/unplugged-why-ev-chargers-are-so-unreliable-and-what-we-can-do-about-it)

[EV Charging Stations](https://blog.ph1c.com/the-latest-in-building-code-and-permitting-news/tag/ev-charging-stations) [EV Charging](https://blog.ph1c.com/the-latest-in-building-code-and-permitting-news/tag/ev-charging) [EV Chargers](https://blog.ph1c.com/the-latest-in-building-code-and-permitting-news/tag/ev-chargers)

### [Unplugged: Why EV Chargers Are So Unreliable and What We Can Do About It](https://blog.ph1c.com/the-latest-in-building-code-and-permitting-news/unplugged-why-ev-chargers-are-so-unreliable-and-what-we-can-do-about-it)

As the world transitions towards a greener future, electric vehicles (EVs) are becoming an increasingly popular choice for environmentally conscious consumers. However,...

![Joe Reardon](https://blog.ph1c.com/hs-fs/hubfs/Cool-avatars-anonymous-avatar.jpeg?width=45&name=Cool-avatars-anonymous-avatar.jpeg) 

[Joe Reardon](https://blog.ph1c.com/the-latest-in-building-code-and-permitting-news/author/joe-reardon) 

[Read More](https://blog.ph1c.com/the-latest-in-building-code-and-permitting-news/unplugged-why-ev-chargers-are-so-unreliable-and-what-we-can-do-about-it)

[![](https://blog.ph1c.com/hubfs/evconnector.jpeg)](https://blog.ph1c.com/the-latest-in-building-code-and-permitting-news/the-evolution-of-ev-charger-connectors-why-teslas-standard-is-leading-the-way)

[EV](https://blog.ph1c.com/the-latest-in-building-code-and-permitting-news/tag/ev) [EV Charging](https://blog.ph1c.com/the-latest-in-building-code-and-permitting-news/tag/ev-charging) [EV Chargers](https://blog.ph1c.com/the-latest-in-building-code-and-permitting-news/tag/ev-chargers)

### [The Evolution of EV Charger Connectors: Why Tesla's Standard is Leading the Way](https://blog.ph1c.com/the-latest-in-building-code-and-permitting-news/the-evolution-of-ev-charger-connectors-why-teslas-standard-is-leading-the-way)

As the world transitions towards electric vehicles (EVs) to combat climate change and reduce our dependence on fossil fuels, the infrastructure supporting these green...

![Joe Reardon](https://blog.ph1c.com/hs-fs/hubfs/Cool-avatars-anonymous-avatar.jpeg?width=45&name=Cool-avatars-anonymous-avatar.jpeg) 

[Joe Reardon](https://blog.ph1c.com/the-latest-in-building-code-and-permitting-news/author/joe-reardon) 

[Read More](https://blog.ph1c.com/the-latest-in-building-code-and-permitting-news/the-evolution-of-ev-charger-connectors-why-teslas-standard-is-leading-the-way)

#### About

- Our Team
- What we do
- FAQ
- [Privacy Policy](https://ph1c.com/privacy-policy)

#### Services

- [Building Permits](https://ph1c.com/home)
- [Building Code & Zoning Analysis](https://ph1c.com/home)
- [Wireless Networking Services](https://ph1c.com/home)

#### News

- [Why Should You Get a Building Permit](https://blog.ph1c.com/the-latest-in-building-code-and-permitting-news/why-should-you-get-a-building-permit)
- [All about 5G](https://blog.ph1c.com/the-latest-in-building-code-and-permitting-news/all-about-5g)

[Follow us on LinkedIn](https://www.linkedin.com/company/phase-1-consulting/?viewAsMember=true) [Follow us on Facebook](https://www.facebook.com/profile.php?id=100087212929578&is_tour_completed=true) [Follow us on Facebook](https://www.ph1c.com/privacypolicy)

```json
{
  "@context" : "https://schema.org",
  "@type" : "BlogPosting",
  "author" : {
    "@type" : "Person",
    "name" : "Joe Reardon",
    "url" : "https://blog.ph1c.com/the-latest-in-building-code-and-permitting-news/author/joe-reardon"
  },
  "dateModified" : "2022-12-12T15:29:04.132Z",
  "datePublished" : "2022-12-12T15:29:04.000Z",
  "headline" : "The Latest News in EV Charging Station Infrastructure",
  "image" : [ "https://blog.ph1c.com/hubfs/EV%20Garage%20Charging.jpeg" ],
  "mainEntityOfPage" : {
    "@id" : "https://blog.ph1c.com/the-latest-in-building-code-and-permitting-news/the-latest-news-in-ev-charging-station-infrastructure",
    "@type" : "WebPage"
  },
  "publisher" : {
    "@type" : "Organization",
    "logo" : {
      "@type" : "ImageObject",
      "url" : "https://blog.ph1c.com/hubfs/Phase1_Logo.png"
    }
  }
}
```